Below is a sample of our exciting experience.  Please contact us for a full resume or a resume specific to your type of project.

200 Las Olas Circle, Fort Lauderdale, FL

A new 204,037 square foot, 17 story mixed-use building.  There are six floors of parking and nine floors of class A office space.  The building is constructed using post-tensioned slabs and beams at garage levels and pan-joist system at office levels.  Utilizes cast-in-place concrete columns and shear walls.

Salam Y. Blaney, PE
Engineer of Record

The Shoppes at Veranda Falls, Fort Lauderdale, FL

 

52,000 square feet of retail/restaurant space.  Building is constructed using masonry walls with steel bar joists.

Salam Y. Blaney, PE
Engineer of Record

The Allure, Fort Lauderdale, FL

96,028 S.F. five story condominium building, constructed with pile foundation, reinforced concrete building with post tensioned slab system, and CMU/LT. gage infill walls

Salam Y. Blaney, PE
Engineer of Record

Gateway at Riverwalk, Sanford, FL

6 story condominium building, constructed with masonry walls and precast hollowcore slab system.

Salam Y. Blaney, PE
Project Manager

City Furniture, Tamarac, FL *

720,000 square foot warehouse addition to City Furniture Headquarters.  Tilt-up concrete walls with steel bar joist roof system.

Salam Y. Blaney, PE
Engineer of Record

City Furniture, Fort Myers, FL

114,000 square foot furniture showroom.  Tilt-up concrete walls with steel bar joist roof system.

Salam Y. Blaney, PE
Engineer of Record

City Furniture, Naples, FL

85,505 square foot showroom.  Tilt-up concrete walls with steel bar joist roof system.

Salam Y. Blaney, PE
Engineer of Record

* Noted Projects were done while individual was under the employement of other firms such as,  Braga Blaney Associates, Inc., .